In order to fight against climate change and promote a green tomorrow, starting from October 1, 2018 (CLP) / January 1, 2019 (HK Electric), solar power owners can generate electricity from HK$2.5 to HK$4 per kilowatt-hour (depending on power generation) Scale) Sell the generated electricity to Liangdian, the price is much higher than the current charge of HK$1-1.5 per kilowatt-hour.
This plan lasts for 15 years until 2033, and the investment return period of the locked solar power generation system is 3-4 years, so that the owner can earn stable high-priced electricity for another 12-13 years (the annual return rate is about 20%), and then Continue to earn your normal electricity bill. Residential and industrial and commercial customers only need to install a solar power generation system at a registered address and successfully connect the system to the grid of the power company to enjoy the feed-in tariff.
One-Stop Application for Grid Project
Application process
- On-site survey: On-site survey and measurement by professional consultants, design system for customers to choose
- Submit application: Submit the required application documents, once approved, implement the procurement of equipment
- Construction: installation and construction by experienced engineers
- Specialist test: system test is carried out by a special person and a report is submitted
- Obtained certificate: Obtained the approval certificate of the power company’s on-grid electricity price
- Successful access to the grid: Successfully connect to the grid and earn profits
Petition qualifications
You only need to meet the following conditions to participate in this program:
- You are a registered customer of CLP
- Your renewable energy system generates electricity from the sun and/or wind
- System installed at your registered address
- The total power generation capacity of the system is not more than 1 MW
- Your renewable energy system can be connected to the CLP grid without CLP needing to increase grid capacity or carry out grid reinforcement works
On-site survey and measurement by professional consultants,
Design system for customers to choose
Submit the required application documents,
Once approved, implement the purchase of equipment
by experienced engineers
Carry out installation and construction
System testing is carried out by special personnel,
report submission
get the power company
On-grid tariff approval certificate